Resources
Solar + Battery Basics for UK Homeowners
A clear guide to what happens when you add battery storage to solar PV.
Published: 12 March 2026 ยท 3 min read
Before booking
Confirm what evidence is missing
For solar survey evidence, the weak point is usually not the headline requirement. It is the missing photo, document, measurement, or site note that stops the next person from trusting the job record.
During survey
Capture the detail once, then label it properly
A survey report should show what was seen, what was measured, what could not be accessed, and what still needs a design or installer decision. That keeps assumptions visible instead of hiding them inside a photo set.
After delivery
Use the report to reduce internal handover friction
The office, design, and install teams should be able to open the same report and understand the evidence path. If the page helps you spot what to ask for before survey day, it has done its job.
For a live project, pair this guidance with the sample report, deliverables, and guide price builder so the job is reviewed against the same standard Vertex uses for survey delivery.
The practical test is whether the page changes what happens next on a real property. If it helps your team ask for the right evidence, avoid a weak assumption, or brief the surveyor more clearly before the visit, it is supporting the job rather than adding another generic resource to the pile.
For Vertex, that means turning the article into action: check the evidence route, agree the scope, then capture the site detail in a report the next team can read without rebuilding the job from memory.