Supply capacity
- Main fuse rating assessed
- Available capacity confirmed
- Existing supply supports charger load verified
- Supply upgrade needs flagged if required
From £150. Same-day delivery. BS 7671 evidence ready to use.
Electrical supply assessment, consumer unit analysis, cable routing options, earthing and bonding review, charger location options, DNO notification assessment, and labelled site photos.
Guide pricing from £150. We confirm scope, lead time, and the final quote before booking.
An EV charger survey pack documents the electrical infrastructure needed for safe charger installation. The pack covers supply capacity assessment, earthing arrangement documentation, and charger location assessment.
Cable routing notes and any DNO or BS 7671 compliance issues are documented. Delivered same day via Vertex Portal.
EV charger surveys start from £150 per property. The price depends on scope and property complexity — single charger on an external wall is straightforward; multi-point installations or properties needing DNO assessment take more work.
We confirm scope, lead time, and the final number before anything is booked. No surprises on the invoice.
An EV charger survey is a site assessment carried out before a charging point is installed. It checks electrical supply capacity, cable routing options, consumer unit availability, and earthing requirements.
The pack gives installers evidence-led documentation for BS 7671 compliance and safe installation. OZEV/EVHS grant evidence is included where applicable.
Whether you're fitting a 7kW wallbox or a 22kW dedicated charge point, the electrical assessment and location evidence your team needs is in the pack.
The exact deliverables depend on what's booked, but every EV charger survey includes evidence that supports installation decisions and regulatory compliance.
Semi-detached home with 4kW solar PV and 5kWh battery storage. 100A supply, limited consumer unit space. Garage and driveway locations assessed, cable routed from garage to external wall. DNO notification not required. Full electrical and load management documentation in the pack.
Many EV charger installations involve homes with solar PV or battery storage. Our surveys assess all systems together to optimise design and electrical load management.
Consumer unit location and capacity evaluated. Main fuse/breaker rating confirmed. Spare ways or RCD availability checked. Single-phase or three-phase supply verified for charger requirements.
TN-C-S, TN-S, or TT earthing type documented. Bonding arrangements verified. RCD protection and overcurrent settings assessed for EV charger safety compliance.
Route identified from consumer unit to proposed charge point location. Cable length measured. Obstacles noted. Underground vs. surface routing options evaluated for feasibility.
Proposed mounting position suitability reviewed. Wall, post, or pedestal options evaluated. Vehicle access, weather exposure, and structural feasibility confirmed.
Existing solar PV systems assessed if present. Battery storage interaction documented. Load management and smart charging implications flagged. Combined electrical impact evaluated.
BS 7671 compliance framework documented. DNO notification requirements assessed. OZEV/EVHS grant evidence flagged. Pack QC before portal release—your office, design, and install teams get a complete, verified document.
| Aspect | Vertex | Typical installer or one-off survey |
|---|---|---|
| Turnaround | Same day to portal | 3–7 days, emailed as PDF |
| Delivery | Portal (office, design, install teams access) | Email, often incomplete for compliance handoff |
| Quality check | QC before release; BS 7671 and DNO verified | Variable; often missing compliance flags |
| Electrical depth | Supply, earthing, cable routing, DNO, grant prep | Basic; DNO and compliance often missed |
| Team access | Office, design, install all access same pack | Install team only; office/design chase for detail |
| Pricing transparency | From £150, confirmed before booking | Variable, surprises on invoice |
No. A proper EV survey covers earthing type (TN-C-S/TN-S/TT), bonding requirements, cable routing options from CU to charge point, location suitability, DNO notification needs, and OZEV/EVHS grant evidence. Missing any of these delays installation or creates compliance risk.
Your electrician can install, but a structured survey pack serves office, design, and install teams—not just the installer. It documents decisions (cable routing, supply capacity, grant requirements) so your office team can quote accurately and designers can plan efficiently. One tool for the whole team.
Yes. Even simple installs need earthing verification, cable route confirmation, and DNO notification check. A survey pack prevents on-site surprises (limited consumer unit space, wrong earthing type) that otherwise delay the job or require rework.
Survey completed, pack delivered through the portal the same day. Your design team starts work immediately.
Every EV charger pack follows the same structure. Your office team processes jobs faster because the format never changes.
BS 7671 evidence, earthing documentation, and DNO assessment captured in a format that supports grant applications and sign-off.
Every EV charger survey follows the same quality process as our ASHP packs (8.7/10 audit score). Same-day delivery, QC check before release, structured format for office and install teams.
See the exact format, evidence structure, and navigator your team will use. Anonymised from a real installation: semi-detached home with solar and battery, EV charger on driveway.
Live anonymised survey showing EV charger assessment with integrated solar and battery. Full electrical, cable routing, and DNO documentation. OZEV grant preparation included in the pack.
Every EV survey documents BS 7671 electrical safety compliance, DNO notification requirements, and OZEV/EVHS grant eligibility. Earthing type, cable protection, and safety documentation captured for office and installation sign-off.
Deepen your understanding of EV survey scope, electrical requirements, and system integration with solar and battery.
An EV charger survey includes electrical supply assessment (consumer unit, spare capacity, single/three-phase), earthing type documentation (TN-C-S, TN-S, TT), cable routing analysis, charge point location assessment, system integration review (if solar or battery present), DNO notification requirements, and OZEV/EVHS grant preparation. All delivered in a structured pack via Vertex Portal same day.
EV charger surveys start from £150 per property. The exact price depends on scope (single location vs. multiple options) and property complexity (single-phase vs. three-phase supply, DNO assessment). We confirm scope, timeline, and the final quote before booking—no hidden fees.
A typical EV charger survey takes 45 minutes to 1.5 hours depending on property size and system complexity. The pack is delivered to your portal immediately upon completion of the site visit.
Yes. An EV survey documents electrical capacity, earthing type, cable routing feasibility, DNO notification needs, and compliance evidence. Installation without this survey risks supply failure, non-compliance with BS 7671, or inability to apply for OZEV/EVHS grants.
Perfect. The survey assesses how the EV charger interacts with existing or planned solar and battery systems. Load management, smart charging implications, and combined electrical impact are all documented together so your design team can optimize the whole system.
Yes. The survey pack includes OZEV/EVHS grant evidence: electrical supply documentation, installation feasibility, and compliance context. Your office team can use it directly in grant applications, and installers have clear documentation for sign-off.
Based in Doncaster, we provide EV charger surveys across England, Scotland, and Wales. Select your area below:
Explore our other survey services and practical guides for installers.