Skip to main content
Air source heat pump survey

Air source heat pump survey UK checklist for installers

Air source heat pump surveys for UK installers, covering ASHP site checks, MCS 020(a) noise inputs, heat loss links, guide pricing, and report handoff.

4.6/5 on Trustpilot · Report on completion · EPC by next morning in the standard flow where in scope.

Guide pricing, sample-report proof, and delivery detail are on the main ASHP survey page.

If the job could still be ASHP or GSHP, the heat pump survey page covers both routes.

For the category explainer, read what is an air source heat pump.

What an air source heat pump survey checks before pricing or design starts

Outside

Unit siting and access

  • Outdoor unit location and practical access
  • Pipe and cable route constraints
  • Planning and neighbour-sensitive considerations
Inside

Plant and emitter context

  • Cylinder and distribution layout
  • Emitter notes and room context
  • Electrical supply evidence where needed
Design

Evidence that prevents rework

  • Heat loss inputs tied to measurements
  • MCS 020(a) sound inputs for ASHP jobs
  • Photos, notes, and floor-plan context in one record

Related air source heat pump pages

Checklist

Survey checklist and evidence list

Air source heat pump survey steps, evidence list, and route explanation before the job is committed.

Pricing

ASHP survey pricing and report detail

Open the main ASHP survey page when you need pricing, sample-report proof, and delivery detail for an air source heat pump survey job.

ASHP vs GSHP

Heat pump survey for ASHP vs GSHP jobs

The heat pump survey overview covers jobs where the system type is still being qualified between ASHP and GSHP.

Frequently asked questions about an air source heat pump survey

An air source heat pump survey checks unit siting, access, sound inputs, plant context, electrics, and the heat loss inputs that affect pricing and design.

In practice, yes: ASHP means air source heat pump. This page is the checklist and scope guide, while the main ASHP survey page covers pricing, delivery detail, and sample-report proof.

The heat pump survey overview is better when the job could still be ASHP or GSHP, or when the system type has not been confirmed.

The report is issued on completion in the standard flow. EPC follows by next morning where it is in scope, and heat loss work follows next day where booked.

Yes. On ASHP jobs, the survey captures the siting, layout, and sound-related inputs needed for the MCS 020(a) route. Use the ASHP survey page if you need the commercial pricing and delivery route around that evidence.