Skip to main content
Pre-installation site evidence

Solar panel survey for UK installers

Roof layout, obstructions, access, shading and electrical evidence recorded before the quote or array layout is treated as final.

Vertex visits the property on behalf of your installer team. We collect and check the site evidence; your team keeps the customer relationship, design and installation decisions.

Guide price From £200

Final scope agreed before booking.

Coverage Full UK

Travel checked from the postcode.

Handover Checked report

Evidence reviewed before issue.

Delivery Vertex Portal

Book, track and collect the job.

Survey-only support. Vertex does not sell or install solar panels, and the standard scope does not replace a structural engineer or the installer’s final design checks.

What a solar panel survey should establish

The visit should leave the office with a usable record of the property, not a folder of unexplained roof photographs. The exact fields follow the agreed booking scope.

Roof layout

The space the array has to work with

  • Roof planes, covering, pitch and orientation context
  • Visible dimensions and usable-area constraints
  • Chimneys, roof lights, vents, dormers and aerials
  • Nearby objects that may affect shading or layout
Access

How the installation team reaches the work

  • Ground and roof-access context visible from site
  • Working-area and equipment-position constraints
  • Loft access and visible roof construction where in scope
  • Questions that need installer or specialist review
Electrical route

The route from generation to the property

  • Meter, cut-out and consumer-unit evidence where in scope
  • Likely inverter position and cable-route context
  • Existing generation or storage noted when visible
  • Potential battery location when included in the booking

This is a pre-installation evidence service. Formal structural calculations, final array design, electrical testing, drone thermography and fault diagnosis are separate services and are not implied by the standard survey.

Evidence for the quote, layout and installation plan

A useful survey makes the next decision easier and shows where more information is still required.

Before quote

See the obvious cost and access constraints

Multiple roof areas, difficult access, long cable routes and combined battery work can be identified before the customer is promised a standard route.

Before layout

Design from the property in front of you

Roof furniture, edge constraints and shading context stay attached to the job so the proposed array is not based only on a clean satellite image.

Before install

Make practical constraints visible early

The office and site team can review access, equipment positions and route notes before labour, scaffolding and delivery plans are committed.

Vertex Portal booking screen showing the Solar PV survey option

One job record from booking to delivery

Raise the booking with the postcode, preferred date and required scope. Scheduled, in-progress and completed work stays visible to the installer team.

  • Book solar, battery and combined survey work
  • Keep the agreed scope with the property record
  • Track progress without chasing separate messages
  • Collect the report and supporting evidence from the job

The roof is only one part of the job

Panel count and orientation matter, but installers also need to understand access, roof furniture, electrical equipment and the proposed route through the property.

That is why the handover groups evidence around practical decisions rather than presenting photographs in the order they were taken.

Review the deliverables
Roof-mounted solar panels showing the working area around a typical array

A report the next team can follow

The report is written for people who were not at the property. Site facts, photographs and open questions should be easy to find without calling the surveyor for an explanation.

Site summary

Property and scope first

The handover identifies the property, the work requested and the roof or electrical areas covered by the visit.

Grouped evidence

Photos placed beside the relevant detail

Roof, access and electrical evidence is arranged by subject so the design and operations teams can review the part they need.

Quality check

Missing or uncertain information stays visible

The job is checked before issue. Assumptions and evidence gaps are flagged for review rather than being presented as confirmed facts.

National capacity with the scope agreed first

Vertex supports installer teams throughout the UK. The postcode, roof arrangement and required extras are checked before the appointment is confirmed.

Guide price

Solar work from £200

The final quote reflects the property, travel, roof complexity and agreed evidence scope. You see the price before the diary is committed.

Combined scope

Add battery or wider renewable checks

Solar and battery evidence can be collected during the same visit when both are included in the booking.

No contract

Use Vertex for one job or ongoing capacity

Installer teams can send an individual property or use Vertex as an external survey operation across a wider region.

Questions about solar panel surveys

The important distinction is scope: pre-installation evidence, structural assessment and post-install inspection are different jobs.

It is a pre-installation site visit that records the roof arrangement, obstructions, access, shading context, electrical equipment and likely cable or equipment routes needed for quotation and technical review.

Send the postcode, property type, known roof arrangement and the scope your team needs. Confirm whether battery storage, additional electrical evidence or multiple buildings are included. Vertex confirms the price and lead time before booking.

Vertex guide pricing starts from £200. Property size, roof complexity, location and any battery or additional electrical scope can change the final price.

The standard survey records visible roof and loft evidence to the agreed scope. It is not a structural calculation or an engineer-signed assessment. Formal structural confirmation must be commissioned separately where required.

No. This page covers pre-installation site evidence. Drone thermography, electrical fault diagnosis and maintenance inspection of an existing array require a different scope.

Yes. Potential battery location, access and relevant electrical context can be added to the booking. Confirm the required storage scope when requesting the price.

Vertex provides solar panel surveys throughout the UK. Availability and travel are checked against the property postcode before the appointment is confirmed.

Installer teams remain responsible for final design, installation and certification decisions. For current certification requirements, refer to the MCS Solar PV Standard.

Choose the right solar route

Use the broader service page for general survey support, or go directly to the technical guide that matches the question your team is trying to answer.

Main service

Solar survey service

The wider Vertex service, including booking, coverage, delivery and survey options.

Site checklist

Solar PV site checklist

A closer look at the measurements, photographs and property information used before the design is finalised.