What strong looks like
Capture standards
- Unit siting photos, boundary context, and access notes for planning and practical installation decisions
- Electrical evidence, hot water context, and routing notes where the booked scope requires them
- Heat loss inputs, emitter context, and floor plans where these are part of the agreed work
- Comprehensive labelled photos with assumptions and constraints recorded beside the evidence