Air Source Heat Pump Survey evidence report
- External unit position, access and routes recorded in one place
- Electrical and plant-room photos grouped for design
- Heat-loss input support and supporting photo evidence grouped by section
Air source heat pump survey reports for projects in Cambridge, with the site detail installers need before quote, design and install.
4.7/5 on Trustpilot · report and organised photos on completion · EPC by next morning in the standard flow.
Guide pricing is shown upfront. Send the postcode and service, and we will confirm timing and the final price before anything is booked.
The point is simple: clear access, electrics, layout, and route detail so the job can keep moving.
Helps remove quote delays caused by missing context around unit position, routes, and evidence quality.
The report is arranged for the people using it next, with the key notes easy to find.
Most delays start when key details are missing around plant position, roof access, cable routes, or supply constraints rather than from the survey visit itself.
Teams here survey for ASHP work across properties where plant positioning, route access, and external unit siting create the main constraints. Gardens with limited depth, external walls with access restrictions, and internal cupboard/plant-room sizing often determine whether designs flow smoothly or need rework.
Clear notes on access, workable routes, and layout constraints help teams avoid re-scoping later.
When routes, roof context, room layout, and obvious constraints are labelled clearly, design and install teams spend less time chasing site clarifications.
The next team usually needs the same things: labelled evidence, clear constraint notes, and enough structure to move without reopening the job.
Related pages: deliverables · portal · FAQs · contact.
Fast turnaround and a consistent report make busy jobs easier to run.
Photos, measurements, and access notes grouped so office and design teams can verify assumptions quickly without extra calls.
Cylinder position, pipe routes, and electrical feed documented so design teams validate emitter sizing and heating layout without delays.
Obstacles, access windows, and routing complexity captured early so install crews face no surprises on site.
Photo evidence and room-level data organised to support faster sizing decisions and emitter layout validation.
Check the sample report, then get pricing for this area.
Clearer evidence around external unit position, routes, and plant-room constraints reduces the back-and-forth that slows quoting.
Design teams validate cylinder clearance, emitter sizing, and pipe route assumptions from grouped evidence, not scattered photos.
Constraints and access issues are shown early, so install crews arrive with fewer surprises and less redesign work.
Next: installer resources · FAQs · how it works.
Standard ASHP survey reports start from £250. ASHP plus room-by-room heat loss starts from £350. See full pricing or build a guide price.