Battery Storage (ESS) Survey evidence pack
- Candidate battery positions and access constraints documented clearly
- Electrical evidence captured for faster install planning
- Structured pack format ready for office, design, and installation teams
Installer-first survey delivery for battery storage projects in Stoke-on-Trent. Clear enough for office, design, and installation teams to move without piecing the job back together.
15,000+ surveys completed · pack + organised photos available on completion · EPC by next morning in the standard flow.
Guide pricing is shown online. We confirm scope, lead time, and final quote before booking. Volume pricing is available for installer partners.
The value is practical: access, electrics, layout, routes, and enough clear detail for the next person to make decisions quickly.
Helps office teams scope storage work with fewer clarification loops and clearer information for install teams.
Everything is organised for practical use, not just record-keeping, with clear signposting for design and install teams.
Most delays start when key details are missing around plant position, roof access, cable routes, or supply constraints rather than from the survey visit itself.
Teams here assess properties where garage, utility room, or internal wall space for battery placement varies significantly. Consumer unit capacity, existing EV charger installations, and cable routing options create the main constraints that need clear evidence before design.
Clear notes on access, workable routes, and layout constraints help teams avoid re-scoping later.
Clean photos of supply equipment, spare ways, plant location, and awkward access points help the office quote faster and stop design getting blocked later.
Office, design, and install teams usually need the same things: labelled evidence, clear constraint notes, and enough structure to move without reopening the job.
Useful next pages: deliverables · portal · FAQ · contact.
Fast turnaround, consistent structure, and portal visibility keep delivery reliable as job volume grows.
Wall space, ventilation requirements, and mounting options captured so design teams can validate placement without site revisits.
Consumer unit evidence, available ways, and supply capacity documented so installers confirm switchgear needs before quoting.
Routing options, access windows, and physical constraints surfaced so install crews face no surprises on site.
Where EV chargers exist or are planned, electrical load context is captured to support battery sizing and CU upgrade decisions.
See quality first via the sample pack, then get pricing for this area.
Clearer CU capacity, available ways, and supply type evidence reduces time spent chasing site clarifications before quoting.
Design teams verify switchgear needs, cable routes, and battery placement from grouped evidence, not assumptions.
Battery position constraints, ventilation needs, and access limitations surfaced before install so crews arrive with predictable scope.
Related reading: installer resources · FAQ · how it works.
From £200 for a battery storage survey pack. Volume pricing is available for installer partners — see full pricing or get pricing.